Paddington Lawns

Upgrade and re-configuration of the main retail area to the rear of the main concourse within London Paddington Station.

  • Client

    Network Rail

  • Contractor

    Spence

  • Architect

    BDP

  • Completion Date

    2017

  • Scope of works

    Large module ‘Bomb Blast’ resistant shopfronts and entrance doors, staircases, balustrading and general metal works.

Lee Warren designed, manufactured and installed architectural metalwork and 6 metre high, ‘bomb blast resistant’ glass shopfronts and doors.

The height of the glass panels created significant logistical issues with the distribution of panels to the workface and the lifting of single panels into position within vertically constrained locations.