Timelapse Video

Watch how through dry assembly offsite, and despite having to assemble the mock up in an inverted orientation, Lee Warren ensured a ‘right first time’ quality installation of the

Heathrow Terminal 2B HV Ducting assembly.

Heathrow Airport Terminal 2B

Scope of Works

Glazed Screens, Balustrades, Structural Steelwork (Primary & Secondary), Offsite manufactured and assembled passenger Fixed Link bridges, bespoke HV Duct support system.

Principal Contractor: Balfour Beatty

Design:  Grimshaw